I was wondering; would it be easier, or cheaper to build the metro tunnel in the same manner as the Harbour (road) Tunnel, using precast tunnel segments lowered into a trench and sealed afterwards, rather than a TBM going through sandstone 40 odd metres below the surface? I thought using segmented construction would allow a shallower approach and hence make stations either side easier, as well as the general advantage of losing a long steep gradient to climb.
Thoughts anyone?