Gippsland rail funding possible to fix 'slow, unreliable' service says Federal Minister
This is beginning to become embarassing for Andrews. We now have the Feds reviewing Albury and Gippsland services. I expect some political sparing to come.
Gippsland rail funding possible to fix 'slow, unreliable' service says Federal Minister
When they duplicate the Dandenong line they should electrify it at the same time.This is beginning to become embarassing for Andrews. We now have the Feds reviewing Albury and Gippsland services. I expect some political sparing to come.
Gippsland rail funding possible to fix 'slow, unreliable' service says Federal Minister
- Duplication of the Dandenong rail corridor.
I couldn't agree more
Any part of the Melbourne to Dandenong corridor that's single line should have money allocated immediately from the forward estimates to enable immediate completion of the duplication of this line.
Mike...![]()
Is the comment regarding speed and quality of service true where Chester says the service is worse now than it was 15 years ago? Seems to be a theme across V/Line?"The service is worse" is such an open ended statement.
The report by John Hearsch Consulting that was commissioned by the local Gippsland Councils has a good series of recommendations for infrastructure improvements on the Gippsland line.Any reasoning on the location of Wurruk for a crossing loop ?A new crossing loop at Wurruk (near Sale)
Why is that everytime bevans posts an article, there always has to be some kind of dig at Daniel Andrews? Considering all the work and investment that is currently happening railway-wise, I think it is phenomenal that we are getting so much done.Just my opinion, Bevans as a site admin may be doing a bit of "flaming". ie "jazzing" up an item to make certain it gets a comment and therefore the site gets more traffic. Such flaming is a practice of almost all broadcasters, Jon Fane from ABC 774 Melbourne being a past master.
In saying that, there is always more to do (and that will always be the case), but to always resort to saying "ooo Andrews is in trouble" or "this is embarrassing for Andrews"? Embarrassing for who, exactly? And more importantly, *why*?
Leads me to wonder exactly what your beef is with the current Premier. It comes across like you hold a constant grudge.
I enjoy a good critique and you might find if you look similar critique of the liberals when they were in. Anyone in this state who believes Public Transport issues are being addressed and solved in a timely manner are kidding themselves.Hear, hear.
The V/Line issues have been shocking as has the lack lustre approach to solving them. At the present time Andrews is in charge. He needs to address these critical issues.
I would add an upgrade of Pakenham to the list. Needed now. It only takes things to go slightly out of sequence and the time table falls apart due to lack of platform capacity. The approach signalling is in desperate need of upgrade, especially for down trains. The run time from Dandenong to Pakenham is as bad as Caulfield to Dandenong for country trains being stuck behind the Metro services.
Why is it that run-through facilities are not used for express trains at Oakleigh, Westall and even Dandenong? The infrastructure is there, yet it is not used (normal time table I mean, its rare but sometimes a run through happens at Westall due to mishap or something).
I am surprised that most spin on the Dandenong corridor SkyRail project regards the number of services and capacity. There is no talk about run-time. The new trains will essentially go the same speed as the old ones. The country trains will still be stuck behind the Metro services (that is if the at not terminated at Pakenham, that has not gone away).
I can tell you now Mike if the Liberals were still in, Traralgon trains(not all) would be terminating at Pakenham and depending on when the quadruplication happens it could happen under Labour.I would add an upgrade of Pakenham to the list. Needed now. It only takes things to go slightly out of sequence and the time table falls apart due to lack of platform capacity. The approach signalling is in desperate need of upgrade, especially for down trains. The run time from Dandenong to Pakenham is as bad as Caulfield to Dandenong for country trains being stuck behind the Metro services.
Why is it that run-through facilities are not used for express trains at Oakleigh, Westall and even Dandenong? The infrastructure is there, yet it is not used (normal time table I mean, its rare but sometimes a run through happens at Westall due to mishap or something).
I am surprised that most spin on the Dandenong corridor SkyRail project regards the number of services and capacity. There is no talk about run-time. The new trains will essentially go the same speed as the old ones. The country trains will still be stuck behind the Metro services (that is if the at not terminated at Pakenham, that has not gone away).
METRO has no interest whatsoever in V/Line services, hence the rarity of running V/Line trains through those services when running late at Oakleigh, Westall or Dandenong despite the ability to do so when the need arises....and at Watergardens on the other side of town.
Unlikely trains will be terminated at Pakenham as part of the timetable going forward due to that proposal being way too politically risky.
Mike.
And I agree with Skitz's comment about paring back some of the thinly used stations between Drouin and Pakenham. The frequent stops for negligible passengers slow down the longer distance travellers, many of whom commute long distances to a station. A recent trip to Ballarat showed how much quicker travel is by only stopping at major towns.
I'm just amazed the federal member for Gippsland is actually bothering to fund the trains.I know this place is pretty cynical about politicians, and rightly so, but the federal member (and by extension the federal government) taking an interest in regional public transport can only be a good thing.
Then again, he is very active in the local newspaper doing letters to the editor and might actually be reading the articles in the Latrobe Valley Express on the whole V/line situation.
The issue with Trafalgar is that the stopping service is doomed to be the stopping all stations service and the run-time is poor. Hence the suggestion of pick up service to Warragul then express etc.
And I agree with Skitz's comment about paring back some of the thinly used stations between Drouin and Pakenham. The frequent stops for negligible passengers slow down the longer distance travellers, many of whom commute long distances to a station. A recent trip to Ballarat showed how much quicker travel is by only stopping at major towns.
It's not even that hard to pair back services on places like Yarragon and Trafalgar.... you could drop them to bi hourly services and I don't think most people would notice. Hell I could even go so far to suggest a bus connection to Warragul or Moe even for most services.
METRO has no interest whatsoever in V/Line services, hence the rarity of running V/Line trains through those services when running late at Oakleigh, Westall or Dandenong despite the ability to do so when the need arises....and at Watergardens on the other side of town.
Unlikely trains will be terminated at Pakenham as part of the timetable going forward due to that proposal being way too politically risky.
Mike.I can tell you now Mike if the Liberals were still in, Traralgon trains(not all) would be terminating at Pakenham and depending on when the quadruplication happens it could happen under Labour.
As far as run throughs go at either Oakliegh or Westall it all depends on whose fault it is.
If Metro caused the late running you get a run through if not, tough titties. (fines are costly).
.............................only to have it blown due to WOLO restrictions post Pakenham, even though it had cooled down. I note the WOLO does not knock the Gippsland train as much as it feels, overall the journey took ten minutes longer than time table.Average speed over the length of one run on the timetable is roughly 80km/h funnily enough.... so WOLO's dont throw that out much.