Wynyard tram station pointwork

 
  edison Chief Commissioner

The tandem facing and trailling crossovers in the double-track tunnel immediately north of Wynyard station were electro-pneumatic in function, controlled from a small cabin set into the tunnel wall.
That much is well known, but answer me this:
When the above crossovers were not being used (at other than peak hours), trams used a facing crossover at the  south end of the platform to reach the stub tunnel at the south end of the down track (ready to change poles and proceed into Platform 2 for their next load).
The stub tunnel at the south end of Platform 1 was used to store/refuge service vehicles and defective cars.
How was entry to this latter stub or the facing crossover controlled?
This may seem like historical (59 years ago) trivia, but someone must know . . .

Cheers,

Edison

Sponsored advertisement

  awsgc24 Minister for Railways

Location: Sydney
Trams used a facing crossover at the  south end of the platform to reach the stub tunnel at the south end of the down track (ready to change poles and proceed into Platform 2 for their next load).
edison
AFAIK, the south end facing crossover wasn't originally built, but was a later addition.
  kitchgp Chief Commissioner

This link may be of some help. The paragraphs starting at the bottom of page 16 entitled "The Bridge and Underground Tramway Route" refer:
https://www.sydneytramwaymuseum.com.au/members.old/Trolley_Wire/200%20-%20Trolley%20Wire%20-%20Jun%201982.pdf
Interesting stuff. I guess the facing points were set for the stub, and changed by lever to straight ahead on the few occasions when needed, and the trailing points were spring-loaded, much the same as most single-track terminuses (termini) in Melbourne. The number of trams using the stub, on the first-in last-out principle, could be determined by the drivers, as happens in Melbourne, or station staff.
  georges Train Controller

AFAIK, the south end facing crossover wasn't originally built, but was a later addition.
awsgc24
This letter to the Herald in April 1939 supports that view - http://trove.nla.gov.au/newspaper/article/17583821. The writer claims that the tunnel crossovers were used "only in slack periods." There are some other interesting remarks on the operation of the tram platforms at that time..

For further background on Wynyard tramway points, see the extract below from an email reproduced in a Trams Down Under Thread - http://tdu.to/108622.msg

"The tramway across Sydney Harbour Bridge was built to tramway standards.

The crossovers at Milsons Point, Argyll (tunnel portals), at the Wynyard signal box (electro-pneumatic points) and at the end of Wynyard platforms 1 & 2 were all to tramway standards."