A "new" siding (not a reinstatement of the one pulled out) is a requiremnt of the Ouyen.inc $5M grand plan to build yet another inter-modal freight hub pipe dream.
http://ouyen.vic.au/data/documents/Ouyen-Intermodal-Terminal-Rapid-Appraisal-May-2018-PN.PDF
A continer lift terminal no less. As IF Ouyen could ever compete with Mildura.
"Talking to the State Government" means nothing. They have to talk to all sorts of crack pots.
Back to reality .?
cheers
John