When did this supposed test run take place if in fact it actually did?  Would think a lot specialized wagons fitted with some form cradles would also be needed for the amount of curved sections that will be required for this project.  Media beat up more likely scenario .

What would the locos have been as we can look into the database at Bunbury.
bevans
I doubt that you will find this traffic Benalla to Melbourne at Bunbury. Smile
(Yeah OK smart ar$e I know)Smile

Sponsored advertisement

  speedemon08 Mary

Location: I think by now you should have figured it out
First train hasent even run, wagons havent been delivered yet. In addition to the tunnel not started to be dug yet so only a trickle of panels needs to make its way down in preperation.
  bevans Site Admin

Location: Melbourne, Australia
First train hasent even run, wagons havent been delivered yet. In addition to the tunnel not started to be dug yet so only a trickle of panels needs to make its way down in preperation.
speedemon08

I could understand that as the sightings from Bunbury Street show no concrete panels into Dynon on the SG.  There are however several light engine movements from North Dynon to the North East Line and return.  Driver training?
  freightgate Minister for Railways

Location: Albury, New South Wales
Dates for wagon delivery ?
  Contrillion Junior Train Controller

Location: Geelong, Victoria
Imagine what the concrete might have felt given the following release from the union regarding the ride of the track to Albury:

https://www.railpage.com.au/news/s/rough-riding-in-v-line
bevans
Indeed. Some sections of that track make even a ride on the Rosstown Railway a more attractive option.
  bevans Site Admin

Location: Melbourne, Australia
Has any further progess been made on the utilisation of the two additional sidings which have been added at Benalla?

When can concrete traffic southbound be expected to commence?
  Richard stroker Junior Train Controller

Bevans. When you were younger, did you always ask, are we there yet?
  bevans Site Admin

Location: Melbourne, Australia
Bevans. When you were younger, did you always ask, are we there yet?
Richard stroker

Yes. Smile
  kitchgp Chief Commissioner

It would appear from today's update on the West Gate Tunnel Project website that tunnelling hasn't commenced yet. (Delayed by contaminated soil?). The video shows some panels on site at Maribyrnong already.

http://westgatetunnelproject.vic.gov.au/about/latest-updates/2019-in-review-on-the-project
  Nightfire Minister for Railways

Location: Gippsland
There Is a massive stockpile of finished panels at the Benalla plant.

The rail siding at Benalla looks to be In It's own separate pen (fenced off from the rest of the facility, without a hard stand) with ground level crane rails In place, but no overhead crane spanning the siding.
  kitchgp Chief Commissioner

Given the soil issues at the West Gate Tunnel Project, presumably this is on hold?
  Fatty Deputy Commissioner

Location: Melbourne
There Is a massive stockpile of finished panels at the Benalla plant.

The rail siding at Benalla looks to be In It's own separate pen (fenced off from the rest of the facility, without a hard stand) with ground level crane rails In place, but no overhead crane spanning the siding.
Nightfire
Panels were being stacked along the plant side of the siding fence when we went past this morning with a large mobile crane doing the stacking. I've also heard rumours of a train planned in the not to distant future.
  bevans Site Admin

Location: Melbourne, Australia
There Is a massive stockpile of finished panels at the Benalla plant.

The rail siding at Benalla looks to be In It's own separate pen (fenced off from the rest of the facility, without a hard stand) with ground level crane rails In place, but no overhead crane spanning the siding.
Panels were being stacked along the plant side of the siding fence when we went past this morning with a large mobile crane doing the stacking. I've also heard rumours of a train planned in the not to distant future.
Fatty

Great news.  Can't wait to see the start of the traffic.  Will this be Qube's work?
  bevans Site Admin

Location: Melbourne, Australia
Took a number of photos around Benalla yesterday.  Lots of cement tankers in the yard area stacked 2 high. Photos to Follow.
  Galron Chief Commissioner

Location: Werribee, Vic
Took a number of photos around Benalla yesterday.  Lots of cement tankers in the yard area stacked 2 high. Photos to Follow.
bevans
a lot of pre-cast pannels at the factory down the road those iso tankers are destined for. Not sure the siding has ever seen a train however
  bevans Site Admin

Location: Melbourne, Australia
Here are my photos from yesterday


Siding from east line (not connected) eastern siding looking down. Can see the second siding to the left and the east line main beyond that.


East most siding from the east line Looking up to the station (not connected) is the eastern most siding.


Western siding on east line (not connected) looking UP.  The line to the left is the 1st siding or most easterly siding.


Standing on the western siding of the two with the east line main to the left.  This photo looking down.


Looking across the main lines from the eastern sidings. Cement tanktainers can be seen stacked in Benalla Yard


Standing between the western side siding (of the eastern group) toward the station with the east line immediately to the right.


Looking down standing between the western siding (eastern group) and the east line main.


ARTC Train replacement buses at Benalla 5-7-2020


Coaches replace trains ARTC


Benalla Railway Station Down platform on western side Looking down.


Benalla Railway Station Down platform on western side Looking UP.


Another photo from the down platform looking down.  Second track is a loop I believe and the Okalaknds Line Access tot he left of that.


The down line and Benalla Yard


Another photo looking UP from the down platform at Benalla.


Cement TankTainers stacked 2 high in Benalla Yard on 5-7-2020
  Nightfire Minister for Railways

Location: Gippsland
The disused disconnected sidings on the East line are the decommissioned Benalla Loop and cripple siding.
  bevans Site Admin

Location: Melbourne, Australia
The disused disconnected sidings on the East line are the decommissioned Benalla Loop and cripple siding.
Nightfire

Appreciate the feedback.  Are these the sidings being earmarked for the cement works?  I did see the cement works on the way back from Yarrawonga but have not researched as yet (only just back) the location relative to the rail ine.   The crossing near the cement works was closed for works yesterday and traffic diverted past the cement works.
  Nightfire Minister for Railways

Location: Gippsland
The disused disconnected sidings on the East line are the decommissioned Benalla Loop and cripple siding.

Appreciate the feedback.  Are these the sidings being earmarked for the cement works?  I did see the cement works on the way back from Yarrawonga but have not researched as yet (only just back) the location relative to the rail ine.   The crossing near the cement works was closed for works yesterday and traffic diverted past the cement works.
bevans
I'm sure the disused disconnected tracks are earmarked for removal ! As per other decommissioned crossing loops.
  bevans Site Admin

Location: Melbourne, Australia
I am confused i was under the impression the cement factory would be sending out via rail prefab components for the WGT?  How was this to happen?

Pictures from google maps of wagons in the yard



  Nightfire Minister for Railways

Location: Gippsland
I am confused i was under the impression the cement factory would be sending out via rail prefab components for the WGT?  How was this to happen?
bevans
The pre cast factory Is located several km's North East of Benalla
  bevans Site Admin

Location: Melbourne, Australia
I am confused i was under the impression the cement factory would be sending out via rail prefab components for the WGT?  How was this to happen?
The pre cast factory Is located several km's North East of Benalla
Nightfire

Believe it to be this location which shows the sidings within the plant.  Thanks for assisting in understand how this works.

  bevans Site Admin

Location: Melbourne, Australia
Some closeup screenshots of the facility





  Contrillion Junior Train Controller

Location: Geelong, Victoria
Took a number of photos around Benalla yesterday.  Lots of cement tankers in the yard area stacked 2 high. Photos to Follow.
a lot of pre-cast pannels at the factory down the road those iso tankers are destined for. Not sure the siding has ever seen a train however
Galron
There have been trains in there but none running a regular revenue service as far as I am aware.

There has been at least one loaded test train, the folly of which has been documented on RP a year or two ago.
  Fatty Deputy Commissioner

Location: Melbourne
There have been trains in there but none running a regular revenue service as far as I am aware.

There has been at least one loaded test train, the folly of which has been documented on RP a year or two ago.
Contrillion

The siding was only connected to the main line in September last year and I don't recall seeing anything concrete (Wink) on Railpage about a test train running. Do you recall where you saw it? All I've heard is rumours about it running but no one knows much else. I asked some Qube drivers about it recently but they didn't know when it ran or who drove it.