Inland Railway - Construction Phase

 
  james.au Minister for Railways

Location: Sydney, NSW
Good News

The Narrabri to North Star Environmental Impact Statement (EIS) has been approved, giving the next section of the Melbourne to Brisbane Inland Rail the greenlight. Deputy Prime Minister and Minister for Infrastructure, Transport and Regional Development, Michael McCormack, welcomed the approval, providing further certainty on Inland Rail’s delivery and the significant local jobs and investment the freight rail line will bring.

A
bevans
Bevans is becoming a Queenslander,

A?

Sponsored advertisement

  james.au Minister for Railways

Location: Sydney, NSW
Good News

The Narrabri to North Star Environmental Impact Statement (EIS) has been approved, giving the next section of the Melbourne to Brisbane Inland Rail the greenlight. Deputy Prime Minister and Minister for Infrastructure, Transport and Regional Development, Michael McCormack, welcomed the approval, providing further certainty on Inland Rail’s delivery and the significant local jobs and investment the freight rail line will bring.

A
bevans
With hindsight and (possible foresight), id be getting in and getting the short Stock-Illabo corridor done sooner rather than later.  Droughts are always just around the corner and now that the oeprators know how to get grain from SA to Queensland, id be thinking that corridor would get some use in the next downturn.
  SinickleBird Assistant Commissioner

Location: Qantas Club at Mudgee International Airport
Way too logical, James. I like it.

But, it would need a huge project team, and countless meetings, to change the order of construction. Simply not practical in COVID times.
  Sulla1 Chief Commissioner

The Inland Rail B2G alternative routing via Cecil Plains was released on the November 2nd...short version - more expensive, with greater community impacts than the currently planned corridor through the Darling Downs.

https://www.inlandrail.gov.au/about-us/publications-and-reports/inland-rail-b2g-alternative-route-comparison-review


https://www.inlandrail.gov.au/sites/default/files/documents/GTA%20Final%20Report%20for%20Review%20of%20IR%20route%20via%20Cecil%20Plains.pdf
  james.au Minister for Railways

Location: Sydney, NSW
So a delay to the program for nothing?
  420renegade Beginner

Look at the point speed differences between larger crossing loops and other shorter loops.
In control they are referred to as crossing loops  if they have enough length for a train to continue moving while a cross happens and have high speed points up to 80kph and non crossing loops or refuges 10-25kph.

occasionally the term passing lane will be used between control and drivers
  Jack Le Lievre Assistant Commissioner

Location: Moolap Station, Vic
It has been announced that Trans4m Rail, a joint venture between John Holland and SEE Civil has been awarded the $693 million contract to construct the next section of InlandRail between Narrabri and North Star, NSW.
  freightgate Minister for Railways

Location: Albury, New South Wales
Some big work contracts continuing to flow on the build redressing to see it is making peogress.
  bevans Site Admin

Location: Melbourne, Australia
It has been announced that Trans4m Rail, a joint venture between John Holland and SEE Civil has been awarded the $693 million contract to construct the next section of InlandRail between Narrabri and North Star, NSW.
Jack Le Lievre

Does this section use the existing alignment or is new route work required?  For Example, Moree is on the route?
  Sunbird Station Master

It has been announced that Trans4m Rail, a joint venture between John Holland and SEE Civil has been awarded the $693 million contract to construct the next section of InlandRail between Narrabri and North Star, NSW.

Does this section use the existing alignment or is new route work required?  For Example, Moree is on the route?
bevans
It's all an upgrade of existing track apart from a 2.3km section north of Moree to eliminate a horse shoe curve where the North Star branch leaves the line to Weemelah.
The line is using the existing path through Moree but they are replacing a level crossing with a road overpass.
  bevans Site Admin

Location: Melbourne, Australia
It has been announced that Trans4m Rail, a joint venture between John Holland and SEE Civil has been awarded the $693 million contract to construct the next section of InlandRail between Narrabri and North Star, NSW.

Does this section use the existing alignment or is new route work required?  For Example, Moree is on the route?
It's all an upgrade of existing track apart from a 2.3km section north of Moree to eliminate a horse shoe curve where the North Star branch leaves the line to Weemelah.
The line is using the existing path through Moree but they are replacing a level crossing with a road overpass.
Sunbird

Hi. thanks so the work goes right through to https://www.nswrail.net/locations/show.php?name=NSW:Mungindi&line=NSW:mungindi:0 ?
  Lockspike Deputy Commissioner

It's all an upgrade of existing track apart from a 2.3km section north of Moree to eliminate a horse shoe curve where the North Star branch leaves the line to Weemelah.
The line is using the existing path through Moree but they are replacing a level crossing with a road overpass.

Hi. thanks so the work goes right through to https://www.nswrail.net/locations/show.php?name=NSW:Mungindi&line=NSW:mungindi:0 ?
bevans
Err, no; Mungindi is not part of this gig. The contract is Narrabri - North Star.

If you are wondering where the route crosses into QLD, the line will veer to the NE (about where the current line veers to the NW, about 16km short of Boggabilla), until the new alignment meets the existing narrow gauge line near Kildonan, a former QR location.
  james.au Minister for Railways
  Big J Deputy Commissioner

Location: In Paradise
@bevans see this map

https://inlandrail.artc.com.au/where-we-go/#narrabri-to-northstar
james.au
Thanks James, a great map to reference.
  bevans Site Admin

Location: Melbourne, Australia
@bevans see this map

https://inlandrail.artc.com.au/where-we-go/#narrabri-to-northstar
Thanks James, a great map to reference.
Big J

Yes thanks guys that makes more sense.
  bevans Site Admin

Location: Melbourne, Australia
That's delivery

  james.au Minister for Railways

Location: Sydney, NSW
That's delivery

bevans
Thats spin.
  Jack Le Lievre Assistant Commissioner

Location: Moolap Station, Vic
Today Inland Rail released Five Project Reference Design fly-through videos for the Narrabri to North Star (N2NS) Project.
Narrabri to North Star Project fly-through (Narrabri to Pennys Road) - November 2020.



https://youtu.be/7s4kNL4Dtmg

Narrabri to North Star Project fly-through (Pennys Road to Moree) - November 2020.



https://youtu.be/hGNTzADum1o

Narrabri to North Star Project fly-through (Moree North to Camurra) - November 2020.



https://youtu.be/bH0ktMW8IqI

Narrabri to North Star Project fly-through (Camurra to Crooble) - November 2020.



https://youtu.be/OidJrHF6N5c

Narrabri to North Star Project fly-through (Crooble to North Star) - November 2020.



https://youtu.be/kbZTZ-Qm8_w