Search found 283 matches

grog

Member since May 15, 2007

Last visited yesterday

  View profile

This page has a vague mention of a new alignment from Menangle to Yerrinbool (no date or money attached though): [url=https://caportal.com.au/tfnsw/tiip/pipeline]https://caportal.com.au/tfnsw/tiip/pip ...

People definitely don’t board and alight A and B sets 3 at a time. The wide doors just allow 2 at a time despite people standing at the sides of the doors.

It’s also clear from experience and t ...

Platform screen doors in the CBD will be what enables it to get to 24tph - Not only the shorter separation between trains of ATO, but also the faster (and importantly - more consistent) entry and exit ...

Page 6 mentions 2020 bushfires and COVID-19.

The Erskineville crossovers have already been installed - wires and signals are next.

[quote=djf01]The narrowness of the TH platforms in particular, means PSDs will be of huge benefit there in this regard, if we can ever have two rolling stock orders with the same door paramaters. (He ...

[color=#000000][size=3]Clearance of platforms from incoming crowds isn’t as much a problem as crowding on the platforms caused by people waiting for their specific service. This can be resolved by c ...

But the stations that need it (Town Hall, Wynyard in particular) will never see the D sets (presumably).

Let's simplify things and say that headway is determined by 2 things - dwell at stations and gap between trains.

Improving either of those things will improve headway. Train and station design can  ...

Nah, the new numbers are 18tph T2 and 18tph T8. Perfectly balanced. No need to mess it up with T4 locals.

The new crossovers north of Erskineville mean that the South Coast services will run on the ...

Posted 22 Dec 2018 09:33 in Sydney Suburban by grog

This is a couple of years old, but ATO is definitely on the roadmap.

Posted 05 Jan 2016 18:15 in Sydney Suburban by grog

The section under the harbour is being drilled by special earth pressure balance TBM through the sediment rather than trying to get down to the sandstone.

[quote=jkennedy2]Is the new Sydney Metro to Bankstown via Waterloo and Sydenham going to use platform 26 and 27 at central? I did previously hear mention of a new set of platforms under existing platf ...

Posted 05 Jan 2016 09:15 in Sydney Suburban by grog

[quote=jkennedy2]Does anyone know any details of the new Pitt St station? Specifically:

- will there be an underground interchange with town hall station

- what streets will the entrances be on

- w ...

From the video fly troughs and documentation I have worked out the following as far as planned configuration of the trains:

End car:

3 x longitudinal seats - door - 5 x 2 seat rows - door - 9 x  ...

[quote=davesvline]An interesting observation.

Before we write off the seemingly useless benefits of a 3rd from Caulfield to say Springvale, lets first discontinue use of the centre track between B ...

Posted 22 Sep 2014 12:16 in Sydney Suburban by grog

I very much doubt that the existing timetable wasn't written with the SWRL services just ready to slot in pretty easily.

Expect to see South line terminators/starters (4tph in peak) extended to Lep ...

It's all in here: http://images.smh.com.au/file/2014/01/29/5115403/1_Futurerailplan.pdf?rand=1390985051657

In short:

It would operate on existing track, initial operation patter of 6tph each fro ...

Posted 12 Feb 2014 08:16 in Sydney Suburban by grog

[quote=Alfred3333]My concern is with the Airport and East Hills Line overcrowding once links to Oran Park/Camden and Badgery's Creek Airport are built. Unless new infrastrucutre such as additional tra ...

Posted 18 Jan 2014 23:40 in Sydney Suburban by grog

[quote=ivahri]I'm sorry NSWTRAINS but am I missing something? When the Libs came in the project was on hold... hello? Let's not forget the blonde female Premier... bugger, I've forgotten her name beca ...

Posted 22 May 2013 01:19 in Sydney Suburban by grog

I have done a bit of analysis on the Macarthur to City via East Hills services.

Once again, as per the Liverpool to City via Bankstown/Granville services, there is never an advantage in letting a s ...

Posted 21 May 2013 20:51 in Sydney Suburban by grog

With the split of trains from Liverpool via Bankstown and via Granville, there is currently 3 minutes slower to travel to Central via Bankstown, and the via Bankstown services are 3 minutes behind the ...

There is no doubt that a new harbor crossing needs to be constructed starting right after the NWRL, with all planning done and ready to go at that time.There are currently 15tph in the peak hour from  ...

The gold coast is a city in it's own rightYour point?If you are saying this then you obviously have ignored everything I have said re centers...I don't think you quite understand my idea of distribute ...

Page 2-4 (in the chapter 'Clarifications'): In line with the NWRL, an upgrade of the Epping to Chatswood Rail Link to a high capacity rapid transit system would be required as a separate project to t ...