Looks unlikely that they'll be able to instal electrification infrastructure as the contract is not finalised yet.
Maybe they will have a shuttle from Tonsley to Noarlunga along the expressway which would be quicker for the southern stations.
Hallett Cove Beach could have its unveiling on a train-free line.
This presumably would free up enough trains so the 2000 class would not be needed.