Gheringhap Sightings w/e 25/7/2015
Gheringhap Sightings w/e 18/7/2015
Gheringhap Sightings w/e 20/6/2015
Gheringhap Sightings w/e 11/7/2015
Gheringhap Sightings w/e 2/5/2015
Gheringhap Sightings w/e 16/5/2015
Gheringhap Sightings w/e 23/6/2012
Gheringhap Sightings w/e 3/1/2015
Gheringhap Sightings w/e 13/6/2015
Victoria, 3-10 to 8-10-2004
New lengths of rail being delivered at Little Bispham
As part of the ongoing track maintenance on the Blackpool tramway this week, new rail was being delivered for laying on the main line, adjacent to the turning circle at Little Bispham. On the morning of 16th February, new lengths of rail were being delivered and craned off the back of an articulated lorry, before being positioned with the aid of winch equipped hand trolleys.
A new length of rail being craned into position
The new piece of rail being positioned with winch equipped hand trolleys
Some of the newly delivered rail waiting to be fitted at Little Bispham
This article first appeared on blackpooltram.blogspot.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.9846s | RAM: 6.51kb