16/12/2021 Thur |
|
|
NR68-NR45 1PM6(9714) PN Superfreighter from Perth |
0:46 |
NR27-LDP007 5MW2(9822) PN Steel to Port Kembla, ex Long Island |
1:49 |
BL27-X48-8164 PN SG light engine from McIntyre to fuel point, South Dynon after parking 4CM6 Grain destined for discharge at North Geelong, ex Oaklands, NSW |
2:26 |
S312-S302 SSR BG Grian to Kensington for discharge, ex Deniliquin |
3:04 |
NR122-NR71-NR47 3BM4(9610) PN Superfreighter from Brisbane |
5:04 |
NR108-8169-NR103 4CM3(9694) PN Portlink from Griffith, Leeton, Marrar, Bomen, Ettamogah |
6:07 |
XP2013(front)-XP2003(rear) XPT(ST21) NSW Train Link morning arrival into Melbourne from Sydney |
7:20 |
NR114-NR109 4AM5(9702) PN Superfreighter from Adelaide |
7:45 |
NR114-NR109 hostling toward LPC fuel point after completing 4AM5 duties |
8:22 |
XP2003(front)-XP2013(rear) XPT(ST24) NSW Train Link morning departure from Melbourne to Sydney |
8:43 |
NR21-NR65-LDP008 4SM2 PN Superfreighter from Sydney |
9:58 |
8164-X48-BL27 PN SG light engine from South Dynon to McIntyre to pick up 4CM6 Grain destined for discharge at North Geelong, ex Oaklands, NSW |
10:01 |
N460 8610 V Line morning arrival into Melbourne from Albury |
10:23 |
CM3306-CM3313 4SM7 QUBE SG Containerised Cement from Benalla, ex Maldon, NSW |
11:10 |
G527-G531 PN BG Long Island Wagon Transfer to Tottenham Yard for capacity storage |
11:20 |
N460 8615 V Line midday departure out of Melbourne for Albury |
12:16 |
T363-P14 SSR BG Grain from Tottenham Yard to Appleton Dock for discharge, ex Deniliquin, NSW |
12:47 |
NR68-NR45 5MP2(9821) PN Steel, Intermodal to Perth |
13:56 |
NR103-AN7-NR108 5MC2(9693) PN Portlink to Ettamogah, Bomen, Marrar, Leeton, Griffith |
14:45 |
EL60-VL361-EL62 7922V SCT Freight from Dooen to Appleton Dock |
16:10 |
NR21 D0701V light engine from LPC to UGL, Spotswood |
16:39 |
CM3313-CM3306 5MS7 QUBE SG Containerised Cement to Benalla, Maldon, NSW |
17:16 |
NR109-NR114 5MA5(9701) PN Superfreighter to Adelaide |
17:42 |
P14-T363 SSR BG Grain from Appleton Dock to Tottenham Yard |
17:42 |
N474 8625 V Line evening departure out of Melbourne for Albury |
18:15 |
XP2012(front)-XP2002(rear) XPT(ST23) NSW Train Link evening arrival into Melbourne from Sydney |
18:29 |
NR96 5AM8(8702) JBR Overland from Adelaide |
18:57 |
NR65-LDP008 5MS2 PN Superfreighter to Sydney |
19:01 |
G536-G541 9305 PN Tocumwal freight |
19:55 |
XP2002(front)-XP2012(rear) XPT(ST22) NSW Train Link evening departure from Melbourne to Sydney |
20:01 |
NR71-AN8-NR122 5MB4(9609) PN Superfreighter to Brisbane |
20:09 |
B75-T386 Up SSR BG light engine |
21:07 |
NR53-NR46 2PM5(9712) PN Superfreighter from Perth |
21:10 |
NR96 hostling from South Dynon after completing Overland duties |
21:18 |
N460 8630 V Line evening arrival into Melbourne from Albury |
21:39 |
NR15-NR56-NR42 5MP5(9711) PN Superfreighter to Perth |
21:57 |
NR53-NR46 hostling toward LPC fuel point after completing 2PM5 duties |
21:58 |
S302-S312 SSR BG Grain from Kensington to Tottenham Yard |
22:05 |
EL62-VL361-EL60 9721V SCT Freight from Appleton Dock to Dooen |
23:24 |