T6 Carlingford Line closure for Parramatta Light Rail

 
  WimbledonW Assistant Commissioner

Location: Sydney
Am I missing something? Will they take 3 years to convert to light rail? If so, why?  

T6 line is a short part of the project ... major earth works and a few bridges just for the T6 section ..
viaprojects
The Carlingford line is mostly single line. Will it be duplicated and will such duplication require a lot of earthworks and bridge works?

Sponsored advertisement

  simstrain Chief Commissioner

Am I missing something? Will they take 3 years to convert to light rail? If so, why?  

T6 line is a short part of the project ... major earth works and a few bridges just for the T6 section ..
The Carlingford line is mostly single line. Will it be duplicated and will such duplication require a lot of earthworks and bridge works?
WimbledonW
It has been duplicated except for one bit under the bridge at carlingford. A new bridge over kissing point road but utilising the existing alignment and no significant earthworks.
  RTT_Rules Oliver Bullied, CME

Location: Dubai UAE
Am I missing something? Will they take 3 years to convert to light rail? If so, why?  

T6 line is a short part of the project ... major earth works and a few bridges just for the T6 section ..
The Carlingford line is mostly single line. Will it be duplicated and will such duplication require a lot of earthworks and bridge works?
It has been duplicated except for one bit under the bridge at carlingford. A new bridge over kissing point road but utilising the existing alignment and no significant earthworks.
simstrain
Never was fortunate enough to catch the T6, but the ROW always looked like it was intended to be dual track, or at least easily converted to be dual track, with the cumberland hwy bridge being the exception and this was done probably 50 years back when they didn't care.
  simstrain Chief Commissioner

Check out Paul and his Transport Vlog page at

https://www.youtube.com/c/TransportVlog/videos for updates on Metro and the Parramatta light rail route. Specifically Part 1

https://youtu.be/7b_4OcDyy00 and 2

https://youtu.be/77WzymMoFqQ of the PRL
  viaprojects Assistant Commissioner

Check out Paul and his Transport Vlog


paul needs to look at -> Parramatta Light Rail access changes Parramatta (nsw.gov.au) ... before the next video ..  the tram tracks may not have traffic but the road sections will have live traffic soon ..
  RTT_Rules Oliver Bullied, CME

Location: Dubai UAE
The NSW govt is giving this guy a great oppurtunity and he seems to be doing it well.

M2 would probably be less visual being mostly UG.

WSA Metro  (do we call this M3?) will see him with a fair bit of driving.
  viaprojects Assistant Commissioner

update - most of the works on church street are done ..with fencing mostly only for the stations .. and section between Lennox Bridge and Victora rd is mostly open ..

nice look for prince Alfred Square and anzac weekend ..
  Colonel Leon Junior Train Controller

Location:
Since tracks were taken up in 2020, what will happen to the land of the alignment between Parramatta rd crossing and Camellia?
  viaprojects Assistant Commissioner

Since tracks were taken up in 2020, what will happen to the land of the alignment between Parramatta rd crossing and Camellia?
Colonel Leon
camellia is a light rail stop with the race course section would be the dive tunnel for the metro and the rest has been marked as a service road to parramatta rd ..

a few maps on the sydney metro site ..
  Yappo Train Controller

As expected, Stage 2 is recommended to be postponed due to budget issues and increased costs....ABC SMH
  viaprojects Assistant Commissioner

As expected,
Yappo


just a change in fed government has changed budget planning .. as some works have started on stage 2 ..

hint - when they put raising Warragamba Dam wall as a urgent project you know there is bs in the air .. just need to wait for the budget ..

they currently have a plan of 6 months to install a single light rail station on stage 1 ..
  RTT_Rules Oliver Bullied, CME

Location: Dubai UAE
As expected, Stage 2 is recommended to be postponed due to budget issues and increased costs....ABC SMH
Yappo
As will a number of infrastructure projects. I would dare say unless its under construction now the chances of it starting are slim.
  Yappo Train Controller

Or perhaps not! If a week is a long time in politics, 24 hrs provides plenty of time for a clear decision....SMH

  RTT_Rules Oliver Bullied, CME

Location: Dubai UAE
Or perhaps not! If a week is a long time in politics, 24 hrs provides plenty of time for a clear decision....SMH

Yappo
Fair decision, probably something that will be of value compared to other projects and not a long lead time.
  Totoro Junior Train Controller

Glad to see this project get budget approval finally. A lot of people in Wentworth Point are really happy about this. (I’m hoping it will take some pressure off T9 as well.)

I’m assuming it will cost at least a few billion, maybe $3-4B? So $600M is a good start, but it will need similar/higher levels of funding over several years to see it through.

Would be good to get more bipartisan support/less bickering on these kinds of projects. There’s every likelihood that we will see two more elections before LR2 is operational.
  viaprojects Assistant Commissioner

There’s every likelihood that we will see two more elections before LR2 is operational.
Totoro


should be only one if unlucky .. only core issue is the bridge across parramatta river but have been planning for awhile .. really they don't want a long delay after opening stage 1  ..
  RTT_Rules Oliver Bullied, CME

Location: Dubai UAE
Glad to see this project get budget approval finally. A lot of people in Wentworth Point are really happy about this. (I’m hoping it will take some pressure off T9 as well.)

I’m assuming it will cost at least a few billion, maybe $3-4B? So $600M is a good start, but it will need similar/higher levels of funding over several years to see it through.

Would be good to get more bipartisan support/less bickering on these kinds of projects. There’s every likelihood that we will see two more elections before LR2 is operational.
Totoro
Don'tt hink it will cost that much.

LR is normally ~$100m/km when built in road. Whats the length around 12km?
  Yappo Train Controller

Updated map with new stop names. However, most other maps on the website still have the previous names

  Yappo Train Controller

Stage 1 already $475m over budget
Nine months out from the next state election, it has also emerged that the first stage of the Parramatta light rail line has blown out by $475 million to $2.875 billion, largely due to the cost of remediating highly contaminated land for a tram depot and recent flooding.
SMH
  Yappo Train Controller